2024 Building Directors
President-Muthuvel Jayachandran
Secretary-Romano Cressoni
Treasurer-Derick Behrends
Nicholas Hart
Mary Feuerhelm
Building Seven is a three-story, 18-unit building, that was built in 1970.
The heating system is a central gas-fired boiler that circulates hot water to each unit.
The units are cooled by the use of a wall-mounted air conditioning unit which is the responsibility of the unit owner.
A laundry room with coin-operated machines is located on each floor.
The building has a central water softener for hot water only.
A storage locker is assigned to each unit and is located in a common room and/or laundry room on each floor.
Building 7 has an additional policy regarding balcony railings, which can be found here.