2024 Building Directors
Dubravka Stupar
Mary/Kevin Haugen
Sherrie Martin-Opsahl
Building Four is a three story, 24 unit building, that was built in 1969.
The heating system is a central gas fired boiler which circulates hot water to each unit.
The units are cooled by the use of a wall mounted air conditioning unit which is the responsibility of the unit owner.
A laundry room with coin operated machines is located on each floor.
The building has a central water softener for hot water only.
A storage locker is assigned to each unit and is located in a common room on each floor.